Takaka Hill Site B - Nelson

Takaka Hill Site B, Nelson

Client : Fulton Hogan and NZ Transport Agency Waka Kotahi
Scope of Works : Anchored Shotcrete

Ground Anchor Systems was engaged by Fulton Hogan and NZTA to deliver the anchored shotcrete works at Takaka Hill Site B following the major storm event in mid 2025. The slip caused significant ground movement and loss of road width, requiring a fast, coordinated response to stabilise the hillside and keep State Highway traffic moving.

Our scope included a 350m² anchored shotcrete wall, two 20 metre ground beams, and 120 nine metre ground anchors. Working directly beneath the highway in an extremely tight corridor, our team sequenced the works to maintain traffic flow while managing multiple active work fronts.

The project began with a four metre strip of shotcrete beneath the highway, followed by construction of the ground beams. This allowed us to track our 23.5 ton excavator onto the beam with a long reach DTE mast to drill the upper anchors, before lowering our 400kg hydraulic skid rig to complete the lower anchors 13 metres below. Shotcrete was applied using our excavator mounted robot where possible, transitioning to hand spray as we reached the limits of machine access.

Despite challenging ground conditions, extreme weather, and a tight pre Christmas deadline, the team delivered a high quality result through strong planning and collaboration with Fulton Hogan and other contractors on site.

Takaka Hill is a lifeline for the region, and we’re proud to be trusted with work that directly supports the daily movement and safety of the local community.