Maitai Area 1 Flood Protection Improvements, Portion 5
Client : Nelson City Council
Head Contractor : Fulton Hogan
Ground Anchor Systems are partnering with Fulton Hogan on the construction of a 45m flood wall, delivering additional protection and resilience to the existing flood defence infrastructure in the area.
Our Casagrande C6 is doing the heavy lifting, running a 270mm down-the-hole hammer to drill a total of 34 post holes up to 4m deep.
Where ground conditions demand it, we're deploying a casing system to manage collapsing soils and keep progress on track.
The crew have done great work pushing through in tough weather, and once our steel posts are concreted in, Fulton Hogan will be completing the timber lagging and remaining site works.